Kick Ass Garage Dot Com

      Progress Blog
The Layout Before Work Started Grading/Site Work Foundation Work Framing/Roofing Work HVAC Work Interior Work Flooring Work Exterior Work
   
Framing mess.
Framing messes.
Closet framed in.
Electrical wires going to the box.
Electrical wires run and waiting for connection in the 200 amp box.

Go To Page 8